Opens in a new tab
ADX1,08(-1,10%)

Energy generation

Installed capacity 2025

40%60%
Solar 168 MW
Wind 157 MW
INSTALLED CAPACITY
325
MW
ENERGY PRODUCED
519.7
GWh
GENERATION PORTFOLIO
1,037
MW

We generate renewable electricity through wind and solar technology.

We have solar PV farms at different stages of development in Spain, Italy and Portugal, as well as wind farms in Spain, France, Poland and Panama.

Select country

International presence

Shows an overview summary or leave this item as the component’s initial view.

Generation in Spain

Generation in Spain

• Wind farms in operation - 45 MW
• Solar PV plants in operation – 168 MWp
• Solar PV plants under construction - 32 MWp
• Solar PV plants in development – 301 MWp

Generation in France

Generation in France

Wind farm in operation - 12 MW
Generation in Italy

Generation in Italy

• Solar PV plants in development - 164 MWp
• Solar PV plants under construction - 4 MWp
Generation in Portugal

Generation in Portugal

Solar PV plants in development - 211 MWp
Generation in Poland

Generation in Poland

Wind farm in operation - 34 MW.

Generation in Panama

Generation in Panama

Wind farm in operation 66 MW*
*Audax holds a 30% stake

TOTAL Portfolio - MW 2025

MW Early stage Grid Connection Environmental Approval Backlog Under Construction Operation Total pipeline %
Spain - - 6 295 32 213 546 52.6%
Portugal - - - 211 - - 211 20.4%
Italy - 139 - 25 4 - 168 16.2%
France - - - - - 12 12 1.2%
Poland - - - - - 34 34 3.3%
Panama * - - - - - 66 6 6.4%
Total 0 139 6 531 36 325 1,037 100%
MW
Spain
Early stage
-
Grid Connection
-
Environmental Approval
6
Backlog
295
Under Construction
32
Operation
213
Total pipeline
546
%
52.6%
MW
Portugal
Early stage
-
Grid Connection
-
Environmental Approval
-
Backlog
211
Under Construction
-
Operation
-
Total pipeline
211
%
20.4%
MW
Italy
Early stage
-
Grid Connection
139
Environmental Approval
-
Backlog
25
Under Construction
4
Operation
-
Total pipeline
168
%
16.2%
MW
France
Early stage
-
Grid Connection
-
Environmental Approval
-
Backlog
-
Under Construction
-
Operation
12
Total pipeline
12
%
1.2%
MW
Poland
Early stage
-
Grid Connection
-
Environmental Approval
-
Backlog
-
Under Construction
-
Operation
34
Total pipeline
34
%
3.3%
MW
Panama *
Early stage
-
Grid Connection
-
Environmental Approval
-
Backlog
-
Under Construction
-
Operation
66
Total pipeline
6
%
6.4%
MW
Total
Early stage
0
Grid Connection
139
Environmental Approval
6
Backlog
531
Under Construction
36
Operation
325
Total pipeline
1,037
%
100%
*Audax holds a 30% stake

Installed capacity MW

Installed capacity (MW) 2025 % 2024 % Var. (%)
Spain 213 65% 155 58% 37.1
France 12 4% 12 4% 0.0
Poland 34 11% 34 13% 0.0
Panama * 66 20% 66 25% 0.0
Total 325 100% 267 100% 21.5
Installed capacity (MW)
Spain
2025
213
%
65%
2024
155
%
58%
Var. (%)
37.1
Installed capacity (MW)
France
2025
12
%
4%
2024
12
%
4%
Var. (%)
0.0
Installed capacity (MW)
Poland
2025
34
%
11%
2024
34
%
13%
Var. (%)
0.0
Installed capacity (MW)
Panama *
2025
66
%
20%
2024
66
%
25%
Var. (%)
0.0
Installed capacity (MW)
Total
2025
325
%
100%
2024
267
%
100%
Var. (%)
21.5
*Audax holds a 30% stake

Energy production

More installed capacity and energy production from 100% renewable sources.

More installed capacity and energy production from 100% renewable sources.

Production 2024

470 GWh total

Total production

55 GWh
144 GWh
470 GWh total

Production in

Spain 42%
470 GWh total

Production in

France 6%
470 GWh total

Production in

Poland 17%
470 GWh total

Production in

Panama 35%

Production 2025

520 GWh total

Total production

38 GWh
166 GWh
520 GWh total

Production in

Spain 39%
520 GWh total

Production in

France 5%
520 GWh total

Production in

Poland 14%
520 GWh total

Production in

Panama 42%

2020

91 MW
100% Wind

2025

325 MW
48% Wind
52% Solar

Positive Growth 2020–2025

Our installed capacity has grown from 91 MW in 2020 to 325 MW in 2025, diversifying the source of renewable energy.

Nuestra potencia instalada ha crecido de 91 MW en 2020 a 325 MW en 2025, diversificando el origen de la energía renovable. En 2020 solo procedía de parques eólicos mientras que en 2025 la potencia instalada proviene de dos tipos de energía: 52% procedente de parques solares/fotovoltaicos y 48% de parques eólicos. También la producción ha pasado de 2056 GWh en 2020 a 519,76 GWh en 2025.

Solar PV farms in Spain and Italy

Audax solar plant in Sezze, Italy

Sezze I (In development) – 4 MWp

Audax Navalmoral solar plant in Cáceres, Spain

Navalmoral I, II, III and IV (Under development) – 22 MWp

Audax Lucero solar plant in Seville, Spain

Lucero – 57.48 MWp

Audax Zaratán solar plant in Valladolid, Spain

Zaratán 1 and 2 – 12.4 MWp

Audax Calañas solar plant in Huelva, Spain

Calañas – 4.48 MWp

Audax El Toconal solar plant in Toledo, Spain

El Toconal – 5 MWp

Audax Los Arenales solar plant in Toledo, Spain

Los Arenales – 5 MWp

Audax La Zarzuela photovoltaic plant, Spain_

La Zarzuela I, II, III and IV – 20 MWp

Audax El Madroño solar plant in Toledo, Spain

El Madroño (In development) – 5.6 MWp

Audax La Miranda solar plant in Guadalajara, Spain

La Miranda – 6.87 MWp

Audax Cuatro Caminos solar plant in Guadalajara, Spain

Cuatro Caminos – 22 MWp

Audax Carolinas solar plant in Guadalajara, Spain

Carolinas I and II – 10 MWp

Audax Alberizas solar plant in Guadalajara, Spain

Alberizas I, II, III and IV – 20 MWp

El Rebollo (under development) – 4.12 MWp

Wind farms in Spain, France, Poland and Panama.

Parque eólico Audax El Pedregoso en Cádiz, España

Pedregoso Wind Farms

A, B and D (Tarifa, Cádiz, Spain) – 45 MW

Parque eólico Audax Beausemblant en Francia

Beausemblant Wind Farm (France)

12 MW

Parque eólico Audax Toabré, Panamá

Toabré Wind Farm (Panama)

66 MW

Parque eólico Audax Postolin, Polonia

Postolin Wind Farm (Poland)

34 MW

Battery energy storage systems (BESS) and hybridisation

At Audax, we have positioned battery energy storage systems (BESS) and hybridisation as part of our energy generation strategy for the coming years. Our renewable generation strategy seeks to continuously expand and optimise our portfolio of generation projects, strengthening our vertical integration. This includes repowering wind projects and, crucially, optimising our renewables portfolio by installing batteries. BESS technology BESS not only enables electricity storage, but also drives the concept of hybridisation.

Hybridisation involves combining two or more energy sources (such as solar and battery storage) so they operate together as a single, more efficient system. By integrating battery energy storage systems into our solar PV plants, the entire operation becomes more flexible, faster, easier and safer. This synergy enables our renewable energy plants to respond to market needs more accurately, ensuring clean energy is available exactly when it is most valuable.

Audax has already taken the first steps in this direction, with the launch of its first hybridisation project in Toledo, which integrates a 4.4 MW solar plant with BESS. This progress is essential to our goal of exceeding 850 GWh of energy generated by 2030, reinforcing our commitment to renewable electricity generation through a cleaner, smarter and more stable energy future for everyone.


You may also be interested in

Diverse colleagues working on business partnership with charts information and data research, planning group presentation. Analyzing graphs report with coworkers on files and tablet. Close up.

Energy supply

Beautiful landscape of bamboo grove in the forest at Arashiyama Kyoto Japan

Sustainability