We have solar PV farms at different stages of development in Spain, Italy and Portugal, as well as wind farms in Spain, France, Poland and Panama.
Shows an overview summary or leave this item as the component’s initial view.
• Wind farms in operation - 45 MW
• Solar PV plants in operation – 168 MWp
• Solar PV plants under construction - 32 MWp
• Solar PV plants in development – 301 MWp
Wind farm in operation - 34 MW.
Wind farm in operation 66 MW*
*Audax holds a 30% stake
| MW | Early stage | Grid Connection | Environmental Approval | Backlog | Under Construction | Operation | Total pipeline | % |
|---|---|---|---|---|---|---|---|---|
| Spain | - | - | 6 | 295 | 32 | 213 | 546 | 52.6% |
| Portugal | - | - | - | 211 | - | - | 211 | 20.4% |
| Italy | - | 139 | - | 25 | 4 | - | 168 | 16.2% |
| France | - | - | - | - | - | 12 | 12 | 1.2% |
| Poland | - | - | - | - | - | 34 | 34 | 3.3% |
| Panama * | - | - | - | - | - | 66 | 6 | 6.4% |
| Total | 0 | 139 | 6 | 531 | 36 | 325 | 1,037 | 100% |
| Installed capacity (MW) | 2025 | % | 2024 | % | Var. (%) |
|---|---|---|---|---|---|
| Spain | 213 | 65% | 155 | 58% | 37.1 |
| France | 12 | 4% | 12 | 4% | 0.0 |
| Poland | 34 | 11% | 34 | 13% | 0.0 |
| Panama * | 66 | 20% | 66 | 25% | 0.0 |
| Total | 325 | 100% | 267 | 100% | 21.5 |
More installed capacity and energy production from 100% renewable sources.
More installed capacity and energy production from 100% renewable sources.
Total production
Production in
Production in
Production in
Production in
Total production
Production in
Production in
Production in
Production in
Our installed capacity has grown from 91 MW in 2020 to 325 MW in 2025, diversifying the source of renewable energy.
Nuestra potencia instalada ha crecido de 91 MW en 2020 a 325 MW en 2025, diversificando el origen de la energía renovable. En 2020 solo procedía de parques eólicos mientras que en 2025 la potencia instalada proviene de dos tipos de energía: 52% procedente de parques solares/fotovoltaicos y 48% de parques eólicos. También la producción ha pasado de 2056 GWh en 2020 a 519,76 GWh en 2025.
At Audax, we have positioned battery energy storage systems (BESS) and hybridisation as part of our energy generation strategy for the coming years. Our renewable generation strategy seeks to continuously expand and optimise our portfolio of generation projects, strengthening our vertical integration. This includes repowering wind projects and, crucially, optimising our renewables portfolio by installing batteries. BESS technology BESS not only enables electricity storage, but also drives the concept of hybridisation.
Hybridisation involves combining two or more energy sources (such as solar and battery storage) so they operate together as a single, more efficient system. By integrating battery energy storage systems into our solar PV plants, the entire operation becomes more flexible, faster, easier and safer. This synergy enables our renewable energy plants to respond to market needs more accurately, ensuring clean energy is available exactly when it is most valuable.
Audax has already taken the first steps in this direction, with the launch of its first hybridisation project in Toledo, which integrates a 4.4 MW solar plant with BESS. This progress is essential to our goal of exceeding 850 GWh of energy generated by 2030, reinforcing our commitment to renewable electricity generation through a cleaner, smarter and more stable energy future for everyone.