{"id":11262,"date":"2020-01-20T18:53:24","date_gmt":"2020-01-20T17:53:24","guid":{"rendered":"https:\/\/audax-corporativa.onviastage.es\/noticias\/construction-begins-on-the-canamares-solar-park\/"},"modified":"2026-11-11T16:10:16","modified_gmt":"2026-11-11T15:10:16","slug":"construction-begins-on-the-canamares-solar-park","status":"publish","type":"post","link":"https:\/\/www.audaxenergy.com\/en\/news\/construction-begins-on-the-canamares-solar-park\/","title":{"rendered":"Construction begins on the Ca\u00f1amares solar park"},"content":{"rendered":"<p>\n&#13;\n<p class=\"wp-block-paragraph\">Badalona (Barcelona), January 20, 2020<\/p>&#13;\n<p>Audax, an energy group with a presence in nine countries, has signed a turnkey contract, or EPC (Engineering, Procurement and Construction) contract, between Da Vinci Energ\u00eda, S.L.U. (a subsidiary 100% owned by Audax Renovables, S.A.) and Risen Energy Spain, S.L. (part of the Risen Energy Co. Ltd group) for the construction of the Ca\u00f1amares photovoltaic plant in the municipality of Fontanar (Guadalajara, Castilla-La Mancha), with a capacity of 5 MWp, with construction work on the plant set to begin imminently.<\/p>&#13;\n<p>Likewise, in the coming weeks, the signing of the EPC contract and the start of construction with Risen Energy Spain, S.L. are expected for the Carolinas I and II photovoltaic plants, totaling 10 MWp, both located in the municipality of El Casar (Guadalajara, Castilla-La Mancha).<\/p>&#13;\n<p>The development of the aforementioned projects, with a total capacity of 320 MW, will supply, once they are commissioned, around 600 GWh of energy per year.<\/p>&#13;\n<p>In this new phase of growth, the Audax Group continues to follow its roadmap to achieve its 2022 targets of increasing its customer portfolio from 305,000 to 500,000 and supplying a total of 15 TWh of energy. In addition, it expects to exceed \u20ac1.5 billion in revenue, place EBITDA above \u20ac100 million, and reduce its financial leverage, all with the aim of optimizing the group\u2019s resources in order to create value for its shareholders.<\/p>&#13;\n<p><\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>&#13; Badalona (Barcelona), January 20, 2020 &#13; Audax, an energy group with a presence in nine countries, has signed a turnkey contract, or EPC (Engineering, Procurement and Construction) contract, between Da Vinci Energ\u00eda, S.L.U. (a subsidiary 100% owned by Audax Renovables, S.A.) and Risen Energy Spain, S.L. (part of the Risen Energy Co. Ltd group) [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":9836,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[336,337],"tags":[],"class_list":["post-11262","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-corporate-strategy","category-generation-projects"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/posts\/11262","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/comments?post=11262"}],"version-history":[{"count":1,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/posts\/11262\/revisions"}],"predecessor-version":[{"id":11263,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/posts\/11262\/revisions\/11263"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/media\/9836"}],"wp:attachment":[{"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/media?parent=11262"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/categories?post=11262"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/tags?post=11262"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}