{"id":11228,"date":"2022-12-28T07:38:53","date_gmt":"2022-12-28T06:38:53","guid":{"rendered":"https:\/\/audax-corporativa.onviastage.es\/noticias\/audax-begins-construction-of-22-mwp-from-its-solar-generation-portfolio\/"},"modified":"2026-11-11T15:42:45","modified_gmt":"2026-11-11T14:42:45","slug":"audax-begins-construction-of-22-mwp-from-its-solar-generation-portfolio","status":"publish","type":"post","link":"https:\/\/www.audaxenergy.com\/en\/news\/audax-begins-construction-of-22-mwp-from-its-solar-generation-portfolio\/","title":{"rendered":"Audax begins construction of 22 MWp from its solar generation portfolio"},"content":{"rendered":"<ul>\n<li>\n<h3><strong>With an investment of approximately 16 million euros, the Cuatro Caminos 1, Cuatro Caminos 2, Cuatro Caminos 3, and Cuatro Caminos 4 projects will have a total capacity of 21.87 MWp.<\/strong><\/h3>\n<\/li>\n<li>\n<h3><strong>The future projects are located in the municipality of Cabanillas del Campo, in the province of Guadalajara.<\/strong><\/h3>\n<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p>DECEMBER 28, 2022.\u2013 <span data-olk-copy-source=\"MailCompose\">Audax, an energy group with a presence in nine countries,<\/span> has announced the start of construction for four photovoltaic projects located in the municipality of Cabanillas del Campo, in the province of Guadalajara, which will have a total capacity of 21.87 MWp.<\/p>\n<p>In line with its strategy to continue promoting its generation activity through the various projects that make up its portfolio, Audax plans to invest approximately 16 million euros in their construction.<\/p>\n<p>The project will feature 39,489 modules of 550 Wp with Tier-1 category single-axis trackers, which will allow for the generation of 40.5 GWh\/year.<\/p>\n<p>This installation will connect to the Cabanillas del Campo Substation via its own evacuation line of just over 5 kilometers. The construction period is estimated to be approximately 1 year, as it includes a biological shutdown period from March to June. The company ensures the supervision of the works with top-tier contractors who meet high quality standards under the EPC (turnkey) contract modality.<\/p>\n<p>For the construction of the aforementioned projects, the Group is in a very advanced stage of negotiations to secure appropriate financing. This will be non-recourse financing, following the same structure as other previous projects in the generation portfolio.<\/p>\n<p>Audax currently has 226 MW of installed capacity and 19.2 MWp in the commissioning phase, relating to the La Miranda and Zarat\u00e1n 1 and 2 photovoltaic projects.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>With an investment of approximately 16 million euros, the Cuatro Caminos 1, Cuatro Caminos 2, Cuatro Caminos 3, and Cuatro Caminos 4 projects will have a total capacity of 21.87 MWp. The future projects are located in the municipality of Cabanillas del Campo, in the province of Guadalajara. &nbsp; DECEMBER 28, 2022.\u2013 Audax, an energy [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":9853,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[336,337],"tags":[342,343,344],"class_list":["post-11228","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-corporate-strategy","category-generation-projects","tag-audax-2","tag-photovoltaic-2","tag-solar-2"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/posts\/11228","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/comments?post=11228"}],"version-history":[{"count":0,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/posts\/11228\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/media\/9853"}],"wp:attachment":[{"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/media?parent=11228"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/categories?post=11228"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/tags?post=11228"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}