{"id":11218,"date":"2022-12-03T15:08:48","date_gmt":"2022-12-03T14:08:48","guid":{"rendered":"https:\/\/audax-corporativa.onviastage.es\/noticias\/audax-begins-construction-of-its-photovoltaic-project-in-cigunuela-valladolid\/"},"modified":"2026-11-11T15:33:57","modified_gmt":"2026-11-11T14:33:57","slug":"audax-begins-construction-of-its-photovoltaic-project-in-cigunuela-valladolid","status":"publish","type":"post","link":"https:\/\/www.audaxenergy.com\/en\/news\/audax-begins-construction-of-its-photovoltaic-project-in-cigunuela-valladolid\/","title":{"rendered":"Audax begins construction of its photovoltaic project in Cigu\u00f1uela, Valladolid"},"content":{"rendered":"<br \/>\n<blockquote>\n<ul>\n<li>With an investment of between 7 and 8 million euros, the Zarat\u00e1n I and II project will have a total capacity of 12.3 MWp.<\/li>\n<li>The company expects to create around 70 direct and indirect jobs in the immediate local area.<\/li>\n<\/ul>\n<\/blockquote>\n<p>Audax, an energy group operating in nine countries, has announced the start of construction on its photovoltaic project located in the municipality of Cigu\u00f1uela, in the province of Valladolid, which will feature a total capacity of 12.3 MWp.<\/p>\n<p>In line with its strategy to continue promoting its power generation activity through the various projects in its portfolio, Audax plans to invest between 7 and 8 million euros in its construction. This investment is expected to generate approximately 70 direct and indirect jobs in the immediate surrounding area, subsequently providing employment for around 10 professionals once the plant is operational.<\/p>\n<p>The project will feature 22,560 modules of 545 Wp with single-axis trackers, generating 21.5 GWh\/year. The facility will connect to the Zarat\u00e1n Substation via a 200-meter evacuation line that forms part of a shared evacuation infrastructure with other developers, with an estimated construction period of approximately 7 months. The company guarantees that the works will be carried out by top-tier contractors adhering to high quality standards under an EPC (turnkey) arrangement.<\/p>\n<p>Notable new projects in 2021 include the grid connection of 35 MWp from the Ca\u00f1amares (Cuenca), Carolinas I and II, and Zarzuela I, II, III, and IV (Toledo) plants, as well as the commissioning authorization for the Alberizas I, II, III, and IV (Guadalajara) plants, totaling 20 MWp. Between January and February of this year, the company also completed construction work on the Cala\u00f1as (Huelva), Los Arenales, and El Toconal (Toledo) plants, which together account for 14.5 MWp. In Panama, construction of the Toabr\u00e9 wind farm project\u2014in which Audax holds a 30% stake\u2014has concluded, and the facility is currently undergoing test operations.<\/p>\n<p>Audax currently boasts 226 MW of installed capacity\u2014a 150% increase compared to 2020\u2014nearly half of which (112 MW) is located outside Spain.<\/p>\n<p><\/p>\n<!-- \/wp:post-content -->","protected":false},"excerpt":{"rendered":"<p>With an investment of between 7 and 8 million euros, the Zarat\u00e1n I and II project will have a total capacity of 12.3 MWp. The company expects to create around 70 direct and indirect jobs in the immediate local area. Audax, an energy group operating in nine countries, has announced the start of construction on [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":9844,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[336,337],"tags":[],"class_list":["post-11218","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-corporate-strategy","category-generation-projects"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/posts\/11218","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/comments?post=11218"}],"version-history":[{"count":1,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/posts\/11218\/revisions"}],"predecessor-version":[{"id":11219,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/posts\/11218\/revisions\/11219"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/media\/9844"}],"wp:attachment":[{"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/media?parent=11218"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/categories?post=11218"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/tags?post=11218"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}