{"id":11197,"date":"2023-12-21T10:05:53","date_gmt":"2023-12-21T09:05:53","guid":{"rendered":"https:\/\/audax-corporativa.onviastage.es\/noticias\/audax-begins-construction-of-its-largest-photovoltaic-project-in-andalusia\/"},"modified":"2026-11-11T14:56:47","modified_gmt":"2026-11-11T13:56:47","slug":"audax-begins-construction-of-its-largest-photovoltaic-project-in-andalusia","status":"publish","type":"post","link":"https:\/\/www.audaxenergy.com\/en\/news\/audax-begins-construction-of-its-largest-photovoltaic-project-in-andalusia\/","title":{"rendered":"Audax begins construction of its largest photovoltaic project in Andalusia"},"content":{"rendered":"<ul>\n<li><strong>With an investment of approximately \u20ac46 million, the Lucero project will have a total capacity of 57.48 MWp.<\/strong><\/li>\n<li><strong>The future project is located in the municipality of Carmona, in the province of Seville.<\/strong><\/li>\n<li><strong>This is the largest photovoltaic project built to date by the Group.<\/strong><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><strong>December 21, 2023.\u2013<\/strong> Audax, an energy group with a presence in nine countries, has announced the start of construction on a photovoltaic project located in the municipality of Carmona, in the province of Seville, which will add a total capacity of 57.48 MWp to the Group&#8217;s generation portfolio.<\/p>\n<p>In line with its strategy of continuing to drive its generation activity through the various projects in its portfolio, Audax plans to invest approximately \u20ac46 million, including development costs.<\/p>\n<p>The project will feature approximately 100,000 Tier-1 575 Wp modules with single-axis trackers, enabling the generation of 109 GWh\/year.<\/p>\n<p>The facility will be connected to the Carmona 400 kV substation and will have its own evacuation line of just over 8 kilometers, along with already completed shared infrastructure consisting of: a 220\/30 kV substation (Dulcero) shared with another developer, a 4.8 km 220 kV line, and a 400\/220 kV collector substation to feed the energy produced into REE&#8217;s Carmona 400 kV substation. The construction period is estimated at approximately a year and a half. The Group ensures that the works are carried out with top-tier contractors who meet high quality standards, all under an EPC (turnkey) contract arrangement.<\/p>\n<p>The Lucero project represents a new challenge for Audax, as it is the largest photovoltaic plant built by the Group to date and will involve the largest mobilization of resources in the Company&#8217;s generation activity.<\/p>\n<p>For the construction of this project, the Group has already secured financing from the operation closed a few days ago with the European Investment Bank (EIB). This financing will be non-recourse, following the same structure as in other previous projects in Audax&#8217;s generation portfolio.<\/p>\n<p>Audax currently has 245.36 MW of installed capacity and 10.86 MWp in the commissioning phase for the Cuatro Caminos 1 and 3 photovoltaic projects. It is also at an advanced stage of construction for the Cuatro Caminos 2 and 4 and El Rebollo plants, with a combined total capacity of 14.975 MWp.<\/p>\n<p>In a year in which the Group reported a gross operating profit (EBITDA) of \u20ac77.3 million during the first nine months, this operation, together with future operations yet to come, will reinforce the expected organic growth for the coming years, during which the Group expects to maintain an annual EBITDA of around \u20ac100 million on a stabilized basis.<\/p>\n<p><strong> <\/strong><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>With an investment of approximately \u20ac46 million, the Lucero project will have a total capacity of 57.48 MWp. The future project is located in the municipality of Carmona, in the province of Seville. This is the largest photovoltaic project built to date by the Group. &nbsp; &nbsp; December 21, 2023.\u2013 Audax, an energy group with [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":9864,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[336,337],"tags":[342,343,344,345],"class_list":["post-11197","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-corporate-strategy","category-generation-projects","tag-audax-2","tag-photovoltaic-2","tag-solar-2","tag-wind"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/posts\/11197","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/comments?post=11197"}],"version-history":[{"count":0,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/posts\/11197\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/media\/9864"}],"wp:attachment":[{"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/media?parent=11197"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/categories?post=11197"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/tags?post=11197"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}