{"id":11179,"date":"2025-09-30T07:42:39","date_gmt":"2025-09-30T05:42:39","guid":{"rendered":"https:\/\/audax-corporativa.onviastage.es\/noticias\/audax-achieves-a-net-profit-of-23-2-million-euros-in-the-first-half-of-2025-up-6-compared-to-the-same-period-in-2024\/"},"modified":"2026-11-11T13:19:59","modified_gmt":"2026-11-11T12:19:59","slug":"audax-achieves-a-net-profit-of-23-2-million-euros-in-the-first-half-of-2025-up-6-compared-to-the-same-period-in-2024","status":"publish","type":"post","link":"https:\/\/www.audaxenergy.com\/en\/news\/audax-achieves-a-net-profit-of-23-2-million-euros-in-the-first-half-of-2025-up-6-compared-to-the-same-period-in-2024\/","title":{"rendered":"Audax achieves a net profit of 23.2 million euros in the first half of 2025, up 6% compared to the same period in 2024"},"content":{"rendered":"<p><strong>\u25cf Audax expects to close its third consecutive financial year with an EBITDA exceeding 100 million euros.<\/strong><\/p>\n<p><strong>\u25cf Energy supplied grew by 4.4%, reaching 8.2 TWh; installed capacity increased by 21.6%, reaching a total of 325 MW; and the customer base rose by 15.1% to stand at 475,474.<\/strong><\/p>\n<p><strong>\u25cf Audax has increased its total project portfolio from 955 MW to 1,037 MW, strengthening its renewable generation portfolio in Europe.<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p><strong>SEPTEMBER 30, 2025.\u2013<\/strong> Audax, an energy group operating in nine countries, continues to consolidate the results achieved in previous periods throughout this first half of 2025, driven by improved profitability and growth across its main indicators. In this regard, it is worth noting that it achieved a pro forma net profit\u2014excluding extraordinary financial items\u2014of 23.2 million euros, a 6% increase compared to the same period in 2024, when the result was 21.9 million euros. These positive figures, achieved despite the negative impact of the blackout on April 28, reflect the Group&#8217;s capacity to manage extraordinary events without compromising the stability of its results.<\/p>\n<p>Likewise, operating revenue increased by 7.2% in the first quarter of 2025, taking into account the higher average price in the markets where the Group operates compared to the same period of the previous year (40.3% and 43.2% higher for electricity and gas, respectively). Furthermore, driven by the increase in energy supplied by the Group and its pricing strategy (which in some countries impacts the following financial year), revenue reached 946.9 million euros.<\/p>\n<p>Additionally, Audax expects to close its third consecutive financial year with an EBITDA exceeding 100 million euros, after reaching 59.1 million euros in the first half of the year, of which 11% corresponds to generation and 89% to commercialisation.<\/p>\n<p>It is also worth highlighting that energy supplied grew by 4.4%, reaching 8.2 TWh, and installed capacity increased by 21.6%, reaching a total of 325 MW, driven by investment in new renewable electricity generation projects.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Growth in Customer Base<\/strong><\/p>\n<p>Another highlight of this period was the 15.1% increase in customers, reaching 475,474 (compared to 413,067 at the end of the first half of 2024). Of the current customers, 358,560 are electricity customers and 116,914 are gas customers, exceeding the 100,000 threshold for the first time. This growth is the result of a commercial strategy focused on efficient acquisition, customer retention, and continuous improvement of the customer experience.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>H1 2025 Highlight: Rating Upgrade by EthiFinance Ratings<\/strong><\/p>\n<p>Thanks to the company&#8217;s strong performance, on May 9, 2025, the rating agency EthiFinance Ratings placed Audax Renovables S.A.&#8217;s rating at Investment Grade &#8220;BBB-&#8220;, revising the outlook from Stable to Positive and confirming a further upgrade. This third consecutive rating upgrade was primarily driven by meeting the presented financial forecasts, which have translated into the current consolidated, competitive positioning, as well as solid growth and profitability prospects for the future.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Projects Carried Out During the First Half of 2025<\/strong><\/p>\n<p>During the first half of 2025, the 57.5 MWp Lucero project (Seville)\u2014the Group&#8217;s largest operating solar project in Spain, which began construction in December 2023\u2014was brought into commercial operation. In addition, construction began on the 5.5 MWp El Madro\u00f1o project in Toledo following the signing of the EPC contract. Meanwhile, construction work continues on the 4 MWp El Rebollo project in Yunquera de Henares (Guadalajara), which is already built and undergoing energisation, and construction progresses on the Navalmoral I, II, III, and IV projects, with a combined capacity of 22 MWp (in Extremadura).<\/p>\n<p>On June 9, 2025, the renewable electricity generation portfolio was updated with the addition of the Yechar photovoltaic project, with a peak capacity of 112.2 MWp, located in Campos del R\u00edo (Murcia), along with adjustments to projects in Italy with an estimated capacity of 30.7 MWp, which were in the Grid Connection phase.<\/p>\n<p>Overall, Audax has expanded its total project portfolio from 955 MW to 1,037 MW, reinforcing its renewable generation pipeline in Europe. Of these, 680 MWp are at a very advanced stage of permitting, 32 MWp are under construction, and an additional 325 MW are operational.<\/p>\n<p>Audax holds a significant portfolio of generation projects across Spain, France, Poland, Italy, Portugal, and Panama. The company continues to operate its active portfolio and manage the development of its photovoltaic projects in Spain, Italy, and Portugal\u2014strategic markets for the Group where commercialisation activities are already established.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Strategic Sustainability Plan 2023\u20132025<\/strong><\/p>\n<p>Audax continues to work on implementing its Strategic Sustainability Plan 2023\u20132025, which outlines the roadmap to achieve the company&#8217;s ESG targets and fulfil transparency and reporting obligations toward its key stakeholders.<\/p>\n<p>The plan is structured around four strategic pillars comprising more than 40 initiatives and projects with specific objectives designed to improve the Audax Group&#8217;s ESG performance.<\/p>\n<p>As the plan will conclude at year-end, Audax is already working on updating its ESG strategy, which is scheduled for approval by the company&#8217;s Board of Directors in the final quarter of 2025.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u25cf Audax expects to close its third consecutive financial year with an EBITDA exceeding 100 million euros. \u25cf Energy supplied grew by 4.4%, reaching 8.2 TWh; installed capacity increased by 21.6%, reaching a total of 325 MW; and the customer base rose by 15.1% to stand at 475,474. \u25cf Audax has increased its total project [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":9875,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[334,335],"tags":[342,343,348,347,344,345],"class_list":["post-11179","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-financial-results","category-financing-and-investors","tag-audax-2","tag-photovoltaic-2","tag-rating-2","tag-results","tag-solar-2","tag-wind"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/posts\/11179","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/comments?post=11179"}],"version-history":[{"count":0,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/posts\/11179\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/media\/9875"}],"wp:attachment":[{"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/media?parent=11179"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/categories?post=11179"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/tags?post=11179"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}