{"id":11142,"date":"2026-11-05T08:54:42","date_gmt":"2026-11-05T07:54:42","guid":{"rendered":"https:\/\/audax-corporativa.onviastage.es\/noticias\/audax-commissions-the-el-rebollo-plant-in-guadalajara\/"},"modified":"2026-11-11T11:54:20","modified_gmt":"2026-11-11T10:54:20","slug":"audax-commissions-the-el-rebollo-plant-in-guadalajara","status":"publish","type":"post","link":"https:\/\/www.audaxenergy.com\/en\/news\/audax-commissions-the-el-rebollo-plant-in-guadalajara\/","title":{"rendered":"Audax Commissions the El Rebollo Plant in Guadalajara"},"content":{"rendered":"<div class=\"elementor-element elementor-element-5a181db8 elementor-widget elementor-widget-text-editor\" data-id=\"5a181db8\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n<div class=\"elementor-widget-container\">\n<ul>\n<li>\n<h2 role=\"heading\" aria-level=\"2\" data-uw-rm-heading=\"level\">The project, located in Yunquera de Henares, will feature a capacity of 4.12 MWp<\/h2>\n<\/li>\n<li>\n<h4 role=\"heading\" aria-level=\"3\" data-uw-rm-heading=\"level\">El Rebollo expands Audax&#8217;s proprietary renewable generation portfolio, an activity that complements its core electricity and gas commercialization business.<\/h4>\n<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<h2><strong>Badalona, September 30, 2026.<\/strong> Audax, an international energy group operating in nine countries, has achieved a new milestone with the commissioning of El Rebollo. The photovoltaic project covers an area of 5.96 hectares and is located in the municipality of Yunquera de Henares, in the province of Guadalajara.<\/h2>\n<p>The plant will have a total capacity of 4.12 MWp and is in the final phase prior to entering commercial operation, following the completion of planned generation testing.<\/p>\n<p>The El Rebollo photovoltaic plant will feature 7,482 single-axis tracking modules. In terms of power evacuation, the clean energy generated runs through an underground transmission line measuring 2.54 km to a switching station owned by the distribution company, where it is fed into the electrical distribution grid. The facility will have the capacity to generate approximately 7.38 GWh annually, equivalent to the annual electricity consumption of 2,255 households*.<\/p>\n<p>With El Rebollo, Audax will achieve 172 MWp of photovoltaic capacity in Spain. The company currently operates 22 photovoltaic plants in the country, 19 of which are located in Castilla-La Mancha, the primary autonomous community within its Spanish solar portfolio.<\/p>\n<p>Marc Farriol, Audax&#8217;s Managing Director of Energy Generation, points out: \u201c<em>The commissioning of El Rebollo represents another step forward in expanding our proprietary generation portfolio, driving our contribution to the energy transition. Our goal is to exceed 850 GWh of generated energy by 2030<\/em>\u201c.<\/p>\n<p>Audax also plans to evaluate hybridizing the plant with a battery energy storage system (BESS) at a later stage. This solution would optimize the asset&#8217;s profitability, enhance the management of generated energy, and help foster new economic development opportunities within the local community.<\/p>\n<\/div>\n<\/div>\n<div class=\"elementor-element elementor-element-55e5cbf elementor-widget-divider--view-line elementor-widget elementor-widget-divider\" data-id=\"55e5cbf\" data-element_type=\"widget\" data-widget_type=\"divider.default\">\n<div class=\"elementor-widget-container\">\n<div class=\"elementor-divider\"><\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The project, located in Yunquera de Henares, will feature a capacity of 4.12 MWp El Rebollo expands Audax&#8217;s proprietary renewable generation portfolio, an activity that complements its core electricity and gas commercialization business. &nbsp; Badalona, September 30, 2026. Audax, an international energy group operating in nine countries, has achieved a new milestone with the commissioning [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":10489,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[337],"tags":[],"class_list":["post-11142","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-generation-projects"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/posts\/11142","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/comments?post=11142"}],"version-history":[{"count":0,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/posts\/11142\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/media\/10489"}],"wp:attachment":[{"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/media?parent=11142"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/categories?post=11142"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.audaxenergy.com\/en\/wp-json\/wp\/v2\/tags?post=11142"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}